We were invited by Alliance Leisure to work with them on improvements to Stratford Leisure Centre. The initial phase of the 2021 project, which was procured on a Design and Build basis, included fast-track refurbishments to the changing rooms and gym. The next stage was to split the existing sports hall in two in preparation for the installation of soft play and climbing facilities. The climbing equipment was relocated from an area which we fitted out as a toning area.